Skip to content. | Skip to navigation

Founded in 1979, Solar Oregon is a 501 (c) (3) non-profit membership organization providing public education and community outreach to encourage Oregonians to choose solar energy.
Sections
You are here: Home News "Southern Oregon potato farm goes solar to cut power bills"

"Southern Oregon potato farm goes solar to cut power bills"

Southern Oregon potato farm goes solar to cut power bills

The Associated Press
StatesmenJournal.com

>>Click here to view original article

MALIN, Ore. (AP) — The massive stretch of solar panels, the length of about five semi-truck trailers end-to-end, looks alien amid the expanse of soil in front of Gold Dust Potato Processors headquarters in Malin.

But they could cut the operation's power bills nearly in half, an attractive prospect to an industry facing higher power rates and a higher probability of groundwater pumping because of water regulations.

The panels cost about $5 per kilowatt hour — a cumulative $750,000 — to install, and each irrigation pump solar panel costs about $5.30 per kWh, about $74,200.

Together, the operation's solar panels will produce about 330,000 kWh annually, which a cost-benefit analysis showed will make the initial investment worth the cost.

"It helps us a little with our bills, and helps us move toward being a greener farming system," said Lexi Crawford, business manager for Gold Dust Potato Processors, which primarily grows chipping potatoes used for processed foods like potato chips.

The operation took advantage of the Oregon Feed-in Tariff program, which reimbursed one-third of installation costs. Through the program, Pacific Power will pay the operation a monthly rate for the solar power it produces. That money will go toward paying off installation costs.

During the surface water shortage last year, many farmers turned to groundwater to water their acreage, running up thousands of dollars in electricity bills. Gold Dust pumped groundwater for its fields as well as for the general irrigation system in the Malin-Merrill area, Crawford said.

After installing a 10 kilowatt solar panel at one irrigation pump, its bill for 15 days was a credit of almost $200. When the operation starts pumping in May or June, that electricity credit will be put toward its bill.

Crawford has two large binders of invoices and another filing drawer of information documenting power costs from the processing shed, offices and irrigation pumps. The processing shed and office use about 350,000 kWh annually, and irrigation pumps can run up 140,000 kWh to 240,000 kWh each year.

The large solar panels will generate about 150,000 kWh of electricity annually and each irrigation solar panel will generate about 14,000 kWh, all of which will appear as credit on the Pacific Power bill.

When irrigation pumps are off, the solar panels are still converting sunlight to power for that credit, helping the environment and Gold Dust's bottom line, Crawford said.

 

 
Personal tools
powered by Plone | site by Groundwire Consulting and served with clean energy